Wednesday, March 10, 2010
Strawboss working hard!
Bill putting the final touches of mud on the wall board that covers most of the window into the hall. There will be a space about 10 x 33 inches when it's finished. Cabinets will go where Bill stands.
The kitchen with wallboard. It is now all taped and mudded. Texturizing is next.
Marco putting up wallboard in the bathroom. The guys who do the tiling will put up their own special wall board in the tub/shower area when they come to tile
Vince putting up wall board in the bathroom. At one time all three guys were in there working. There was no room for the photographer!
The Strawboss is, obviously, laying down on the job! She must be getting used to the madness and mayhem that is going on to sleep like this while the guys are running power tools, etc.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment