It has been a long time since I’ve visited, and by now y’all are probably not even checking the blog, and I don’t blame you! I wish I could say I’ve been busy writing the next Great American Novel, but the truth is, I haven’t. I decided to take some time off from working on my novels, and worked with my sis, Marjorie, on a story for a picture book. We’ve actually gotten one done, and are well on the way to complete the second one.
In the meantime, I decided to (finally!) get around to remodeling my kitchen and master bath. When I bought the house I knew both would need remodeling, and now is the time.
Master Bath:
The Kitchen:
The sink and d/w will remain (rather will come back to) where they are, the stove will lmove 90 degrees and be on the same wall as the r/f which will move to the left. The island will be replaced with a longer one, and the back wall (not shown here) will have two floor to ceiling cabinets with a built in buffet between them. I will use the same r/f, sink, and d/w, but am getting a new Viking 4 burner all gas stove.
My friend, Arlyn, taking the kick plate off the island so he can get it out the door. He removed all
The two cabinets he left - the one that was over the stove and the kitchen sink cabinet.
The kitchen is very bare now, and echoes. Tomorrow, the remo crew will be here and move the r/f to the other room, remove the remaining cabinets, and the fun will begin!
No comments:
Post a Comment